McNeil Canyon Road Realignment

Project Data

Project Number:  County Road Project (CRP) 988
Project Length:  Milepost 1.64 - 2.78  (Approx. One Mile)
Construction Schedule:  Anticipated construction in 2025
Last Updated:  August 30, 2023



Vicinity Map

988_VicinityMap

Project Description

This project will re-route a section of McNeil Canyon Rd north of its existing alignment.  The new segment will create a much safer road with appropriate sight distance, the elimination of a dangerous curves, and a reduced grade to 9.4%.  Douglas County proposes the placement of 8-inches of crushed surfacing base course, 4-inches of crushed surfacing top course, and 3-inches of hot mix asphalt with a surface width of 30-feet.  The new roadway will consist of 11-foot travel lanes with 4-foot shoulders, along with additional lane widening through the 2,000-foot horizontal curves.  Vertical and horizontal alignment will be resolved at substandard locations bringing them up to compliance with AASHTO standards for a 50 mph paved, rural roadway.   Guardrail to be installed where appropriate.    

Project Status

This project is currently in the Design Phase and scheduled for construction in 2025.

  1. Call For Bids
  2. Addendums
  3. Plan Holders

Note

In order to be placed on the plan holders list and enable us to forward addendums to you, after downloading plan documents please email Carol Hardie with your:

  • Company Name
  • Address
  • Phone Number
  • Fax Number
  • Email (if different than sending email)
  • Contact Person's Name